Gas Turbine Based Power Plants

125 MW Yoloten Power Plant

  • 125 MW GE Frame 9E Gas Turbine and Generator in Simple Cycle
  • Gas Turbine and Generator, Generator Step-up Transformer, Exhaust system and Stack, GTG auxiliary equipment, WTP, DLN, PEECC, GLAC, GNAC, isolated phase busduct, Distribution Transformers, 220 kV HV cable, MV SWG.
  • Scope of works include:  Mechanical and Electrical Installation, Pre-commissioning and Commissioning Works of Power Plant Package.
  • Project Schedule: 9 months

Main Contractor      : Petrofac International (UAE) LLC

EVER Involvement :

Electromechanical erection and installation Contractor - Construction of Complete Gas Turbine Systems including exhaust stack, transformer, fuel delivery, WTP, and all other auxliaries, precommissioning and commissioning assistance.